Building Regulations Support

Building control approval sits alongside planning and is assessed on a different basis. We prepare the compliance package — plans, calculations and specifications — and liaise with building control through to completion.

Split view of a bare concrete interior beside the same space finished as a living room

From structure to specification, compliance is documented at every stage of the build.

  • Building site with a concrete frame and blockwork beside rolled construction drawings and a hard hat
  • Contemporary house under construction with scaffolding, above the same house completed
  • Split view of a concrete building frame beside the finished contemporary home
How we work

Our process

A structured route from first call to approval.

  1. Regulatory review of the proposed scheme

  2. Full plans and construction details submission

  3. Building notice coordination where required

  4. Structural calculation coordination

  5. Specification and materials documentation

  6. Stage inspection scheduling and completion certificate

Consultants around a table reviewing a lit architectural model of a building set on drawings
Why work with us

Key benefits

What you get on every project.

  • One team covering both planning and building control
  • Coordinates directly with your structural engineer
  • Avoids the common causes of build-control rejection
  • Completion certificate handled for you

Not sure which service you need?

A short call is usually enough to work out the right route and a realistic timescale. It costs nothing.